Project Overview 

We are carrying out essential infrastructure upgrades in Glencaple Village, Dumfries and Galloway to enhance the capacity and resilience of our underground septic system, ensuring better protection against coastal flooding and to support growth in the local population.

What we are doing

Our delivery partners, George Leslie, will be:

  • Decommissioning the existing septic tank, which is currently undersized and vulnerable to flooding.
  • Installing two larger underground septic tanks adjacent to the current location to increase capacity and reliability.
  • Implementing additional works to futureproof the site, addressing both flooding concerns and long-term asset protection.
  • Reprofiling the ground to raise the site level and reinforcing embankments to enhance stability and safeguard the new infrastructure.

These improvements will help ensure a more resilient wastewater system for the community, reducing flood risks and enhancing environmental protection.

At a glance

  • £2 Million Investment
  • Work undertaken in partnership with George Leslie
  • 6 month timeframe
  • Addressing wastewater capacity issues

 

"A coastal landscape with grassy and marshy terrain in the foreground. A stone wall extends into the water on the left, and a modern boathouse with a slanted roof is visible in the middle ground. To the right, there is a large, multi-story white building with several windows. The sky is clear and blue, and the scene is illuminated by bright sunlight."

Village of Glencaple

Overview of location of septic tanks. South of The Boathouse Restaurant

Latest Update March 2026

Our latest stakeholder update meeting took place on Monday 9th March.

The project began on Monday 16th March 2026. 

Regular updates will be posted on this page and Scottish Water social media pages.

Latest documents involving the project will be published here.